Results of GEOS performances on liquidations of consequences of flood in Western Ukraine
24.11.2008
On November, 24 Act of state commission was signed on putting into operation of object «Liquidation of consequences of flood on Bystritsa River Solotvinskaya in Pidgirya Village of Borodchanskyy district of Ivano-Francovska area», where bank works were made by GEOS company.
On December, 3 in Monastyrchane village on Manyavka River 4 bunds are prepared to be put into operation.
on December, 10 is appointed a state commission on adopting an object on Bystrytsya River on resumption of water abstraction, where 450 m of building were done by the the reinforced concretes slabs, and also fixed piles and filled by concrete.
In Chernivetska area renovation of dumb #9 is being finished with its general length of 450 m (385 m – basic, 150 m – additional).
On the whole, work on liquidation of consequences of the flood in Ivano-Frankivska and Chernivetska areas approach to completion, all works are executed in the exactly conditioned terms in in accordance with the calendar schedule.
Look a photo
On December, 3 in Monastyrchane village on Manyavka River 4 bunds are prepared to be put into operation.
on December, 10 is appointed a state commission on adopting an object on Bystrytsya River on resumption of water abstraction, where 450 m of building were done by the the reinforced concretes slabs, and also fixed piles and filled by concrete.
In Chernivetska area renovation of dumb #9 is being finished with its general length of 450 m (385 m – basic, 150 m – additional).
On the whole, work on liquidation of consequences of the flood in Ivano-Frankivska and Chernivetska areas approach to completion, all works are executed in the exactly conditioned terms in in accordance with the calendar schedule.
Look a photo